Davidson Springs, Phases 3 and 4

Recent Update:

Project page updated 7/29/19

Limited clearing operations will be starting soon. The initial clearing will be for the installation of erosion control devices. A complete timeline is expected from the applicant soon.


  1. Site Info
  2. Timeline
  3. Documents
  4. Contact

Site Info

Proposing to develop +/-4.56 acres of currently vacant land in to fourteen single-family detached lots.

James Alexander Way (existing) will be extended in a southerly direction past parcel 00705114 (Lassiter property), at which point it will turn in an easterly direction and intersect with Walnut Street (existing).

Greenway construction will be included as part of this project.